Tongyang Group Sells off Waste Heat Recovery Power Plant in Samcheok
Tongyang Group Sells off Waste Heat Recovery Power Plant in Samcheok
  • Korea IT Times (info@koreaittimes.com)
  • 승인 2013.09.03 18:12
  • 댓글 0
이 기사를 공유합니다

SEOUL, KOREA- Tongyang Group said on September 2 that its group company Tongyang Cement has sold a waste heat recovery power plant in Samcheok, Gangwon Province, to Samcheok Energy at 40 billion won.Located within the compound of Tongyang Cement, the power plant was completed in 2004 and has been producing 100,000-MWh electricity a year. The acquirer Samcheok Energy is a company invested by a private equity fund run by Macquarie Korea Opportunities Management Ltd.
 
Samcheok Energy will from now on sell the electricity generated from the power plant to the electricity exchange. Meanwhile, Tongyang Cement will keep earning incomes from the operation as it will supply waste heat coming from its cement kilns.
 
Since the announcement of restructuring in December last year, Tongyang Group has been busy selling off its assets including a ready-mixed cement plant (114.5 billion won), a ship (35.0 billion won), a refrigeration warehouse (34.5 billion won), and a pile business unit (117.0 billion won). The group is in talks with suitors to dispose of Tongyang Magic (kitchen appliance unit) and the textile division of Tongyang Corp.

댓글삭제
삭제한 댓글은 다시 복구할 수 없습니다.
그래도 삭제하시겠습니까?
댓글 0
댓글쓰기
계정을 선택하시면 로그인·계정인증을 통해
댓글을 남기실 수 있습니다.

  • ABOUT
  • CONTACT US
  • SIGN UP MEMBERSHIP
  • RSS
  • 2-D 678, National Assembly-daero, 36-gil, Yeongdeungpo-gu, Seoul, Korea (Postal code: 07257)
  • URL: www.koreaittimes.com | Editorial Div: 82-2-578- 0434 / 82-10-2442-9446 | North America Dept: 070-7008-0005 | Email: info@koreaittimes.com
  • Publisher and Editor in Chief: Monica Younsoo Chung | Chief Editorial Writer: Hyoung Joong Kim | Editor: Yeon Jin Jung
  • Juvenile Protection Manager: Choul Woong Yeon
  • Masthead: Korea IT Times. Copyright(C) Korea IT Times, All rights reserved.
ND소프트