Samsung C&T Bags a $390 Mil. Deal to Build MRT Station in Singapore
Samsung C&T Bags a $390 Mil. Deal to Build MRT Station in Singapore
  • By Oh Hae-young (info@koreaittimes.com)
  • 승인 2015.11.26 11:02
  • 댓글 0
이 기사를 공유합니다

South Korean builder Samsung C&T said on November 25 that it has clinched a $390 million deal with Singapore’s Land Transport Authority (LTA) to construct Marine Parade MRT station (T307 section) on the 43-kilometer Thompson-East Coast Line (TEL), which links northern parts of Singapore’s with Changi Airport.

Under the deal, Samsung C&T will build a 2,684-meter TMB (tunnel boring machine) tunnel, a 343-meter cut-and-cover tunnel and a two-story underground subway station in Marine Parade, an area located in southeastern Singapore.

In Singapore, the company has already completed the C703, C908, and C156 sections of the DTL (Downtown Line) and is currently working on the C922 and C923 sections of the same line, as well as a transfer station in Caldecott and the Thomson Line's 379-meter-long 213 section.


 


댓글삭제
삭제한 댓글은 다시 복구할 수 없습니다.
그래도 삭제하시겠습니까?
댓글 0
댓글쓰기
계정을 선택하시면 로그인·계정인증을 통해
댓글을 남기실 수 있습니다.

  • ABOUT
  • CONTACT US
  • SIGN UP MEMBERSHIP
  • RSS
  • 2-D 678, National Assembly-daero, 36-gil, Yeongdeungpo-gu, Seoul, Korea (Postal code: 07257)
  • URL: www.koreaittimes.com | Editorial Div: 82-2-578- 0434 / 82-10-2442-9446 | North America Dept: 070-7008-0005 | Email: info@koreaittimes.com
  • Publisher and Editor in Chief: Monica Younsoo Chung | Chief Editorial Writer: Hyoung Joong Kim | Editor: Yeon Jin Jung
  • Juvenile Protection Manager: Choul Woong Yeon
  • Masthead: Korea IT Times. Copyright(C) Korea IT Times, All rights reserved.
ND소프트