DL E&C successfully completes construction of S. Korea's largest railway arch bridge
DL E&C successfully completes construction of S. Korea's largest railway arch bridge
  • Lee Jun-sung
  • 승인 2021.07.20 17:37
  • 댓글 0
이 기사를 공유합니다

DL E&C said on July 20 that it has successfully completed construction of South Korea's largest railway arch bridge. / Courtesy of DL E&C

DL E&C said on July 20 that it has successfully completed construction of South Korea's largest railway arch bridge.

The bridge is built in Anseong stream, which crosses Hyundeok-myeon in Pyeongtaek-si, Gyeonggi-do and Yeongin-myeon in Asan-si, South Chungcheon province.

The arch bridge consists of a total of five arch structures. It is similar in size to the arch bridge of Seogang Bridge built on the Han River.

The company used Korea's first construction method to construct the bridge. The method is to assemble a bridge structure on land in advance, move it to a construction location, and install it on a bridge. Uniform quality can be achieved because structures are assembled on land.

DL E&C adopted an arch design to help the bridge become a landmark in the area. 

Meanwhile, DL E&C has been working on the national railroad project for 10 years without any major accidents.


댓글삭제
삭제한 댓글은 다시 복구할 수 없습니다.
그래도 삭제하시겠습니까?
댓글 0
댓글쓰기
계정을 선택하시면 로그인·계정인증을 통해
댓글을 남기실 수 있습니다.

  • ABOUT
  • CONTACT US
  • SIGN UP MEMBERSHIP
  • RSS
  • 2-D 678, National Assembly-daero, 36-gil, Yeongdeungpo-gu, Seoul, Korea (Postal code: 07257)
  • URL: www.koreaittimes.com | Editorial Div: 82-2-578- 0434 / 82-10-2442-9446 | North America Dept: 070-7008-0005 | Email: info@koreaittimes.com
  • Publisher and Editor in Chief: Monica Younsoo Chung | Chief Editorial Writer: Hyoung Joong Kim | Editor: Yeon Jin Jung
  • Juvenile Protection Manager: Choul Woong Yeon
  • Masthead: Korea IT Times. Copyright(C) Korea IT Times, All rights reserved.
ND소프트